It is important that inspection be made upon arrival of the transformer for any signs of damage incurred during shipment. This inspection should be made before removal of the transformer from the truck.
As company we stock materials and a space within, to receive the incoming materials, keep them for as long as they are not required for use and then to move those out of stores for use (Issue).
Power line diversion
Many lines have been diverted in different areas and have been successfully completed however also new line have been constructed. Check out a list of line diversion we have done.
Installation of buildings.
As an Electrical Contractor, we have to obtain the approval in writing from a licensee or supply authority so Planning of Electrical Wiring Work is a Prior to carrying out wiring work.
At Segken Services Ltd, we consider generators to be used for either prime or backup (emergency) power. It’s always maintained to ensure that they provide quality power throughout their service life.
We make sure that your home solar electric system is sized, sited, installed, and maintained correctly is essential for maximizing its energy performance. When installing a PV system, we majorly consider.
SEGAWA SOTIOUS
Managing Director
KEVIN NAMAZZI
Director
TUMWINE NABOTH
Project Manager
SETONGO DERRICK
Surveyor
Plot Horbert street, , P.O.Box 492, Masaka Uganda.
+256 750 447 532, +256 772-447532 +256 750-447532 +256 702-279617